Monday, April 21, 2014

Renovating Sound Fusion Kuching

It has been 2 years since I've been demonstrating in my W13.5 x L23.5 room with a OS fixed frame 100" screen. 

It is time to move on to a totally new business concept. The feature wall holding my 50" plasma has to come down. No TV has the match for a big projector screen (size to price ratio, projector is always the best as compared to television). 

This renovation project should take me 3 weeks for all renovation work and another 1 to 2 months to get all new gears installed and calibrated (HAA and ISF) according to THX specification for home theater. 
Constructing the right wall with a display shelf on the outer portion. 

Wall uses 12.5mm gypsum boards while ceiling uses 10mm gypsum boards. 

A new ceiling design with led strips. 
The new size will be W16 x L27. A 160" Screen Innovation reference lunar maestro G1.1 Acoustic Transparent screen will be used in this new showroom. 

I have short listed to either go for sony 4K or jvc whichever gives me the best bang for the buck. 

Front wall, ceiling and side walls will be treated to make sure the ETC read outs within 350-400ms. 

Tentatively a 9.4 setup with premium pre-amp and 2 units of 7x450 power amp. Equipment list will be reviewed at a later stage. 

Two rows of seats with the rear row with a height raise by 8". 

Karaoke system as well as ECLER professional audio system will be showcase at this new room. 
 
So stay tuned for more exciting renovation updates.